1/28/2024 0 Comments Safe pond dredging ocala fl 34481The greatest value add provided to the client was that C&M Dredging was able to coordinate and accomplish the work on a minimal staging and loading site that would typically require the use of mechanical material dewatering or belt presses in less time and at less cost. Furthermore, the material reduced in volume by 50% from when it was dredged to when it was disposed of through proper implementation of the geotextile tube and polymer dewatering setup. The dredged material was sufficiently dried and loaded into trucks for beneficial reuse within three days after it was pumped into the tubes. Over four months, C&M Dredging used 75 geotextile tubes that were cycled in real-time (8 tubes per cycle) while the dredging was taking place. We introduced a polymer utilizing an automated chemical dosage system to ensure the material rapidly dewatered in the geotextile tubes. To accomplish this task, we employed an 8-inch swinging ladder Ellicott Dredge to pump the material to our dewatering site. The core project challenge was that all the material had to dewatered/dried and loaded for transport on an adjacent site less than one acre in size. The project consisted of removing 53,000 cubic yards of silt and muck from the 10-acre lake utilizing hydraulic dredging. C&M Dredging performed an environmental restoration dredging project to restore water quality and depth to Lake Lorraine in Leesburg, FL.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |